Footpath & Pram Ramp for Parramatta City Council, Max Ruddock Reserve, Winston Hills

We replaced a 50 lineal metre temporary ramp and footpath at Max Ruddock Reserve in Winston Hills with a compliant reinforced concrete footpath and pram ramp, for Parramatta City Council.

We replaced a 50 lineal metre temporary ramp and footpath at Max Ruddock Reserve in Winston Hills with a compliant reinforced concrete footpath and pram ramp, for Parramatta City Council.

Location

Winston Hills, NSW

Service

Civil Concreting

Concrete type

Plain concrete, broomed finish

More about Civil Concreting
The finished curved broomed-concrete footpath along the oval at Max Ruddock Reserve, Winston Hills, with its white guard rail

The brief

Max Ruddock Reserve in Winston Hills had a temporary ramp and an existing footpath that needed replacing, as a civil job for Parramatta City Council. The job covered 50 lineal metres in total.

What we did

The job took three days. Day one was excavation — we ripped out the temporary ramp and the old footpath, then battered the ground to get a smooth, even transition down to footpath level. Day two was formwork and steel. Day three was the pour and finish, in plain concrete with a broomed finish. We also reinstated the pram ramp so the path is easily accessible for wheelchairs.

The result

A new reinforced concrete footpath and pram ramp at the reserve, built to meet Parramatta City Council’s standards and safe and accessible for everyone using the oval.

This is a civil concreting job, completed to council specification. You can see another council job at Meadowbank.

More from this job

The finished footpath meeting the reinstated pram ramp, with its tactile indicators, for easy wheelchair access
The finished broomed concrete apron meeting the curved white guard rail near the clubhouse
The excavator alongside the finished footpath at Max Ruddock Reserve, with the delivery truck on site
A freshly poured section of the reinforced concrete footpath at the reserve
A section of the path part-poured, with reinforcement still exposed further along the curve
Steel reinforcement laid in formwork along the brick edging and guard rail before the pour
A closer view of the steel reinforcement in formwork along the brick edge before the pour
Steel mesh laid in formwork along the full curve of the path beside the oval, with the guard rail and brick edging in place
The excavator bucket close up, with the dirt cleared ready for formwork
A shovel and the excavated trench along the guard rail during site preparation, with the crew working behind the fencing
The excavator bucket on site at Max Ruddock Reserve, with the blue site office and oval behind
The site excavated and battered to a smooth grade down to the footpath level at Max Ruddock Reserve

Get a free quote

Let’s turn your vision into reality!

At Harbourline Group, we stay in constant communication with our customers until the job is done. To get a free quote, or if you have questions or special requests, just drop us a line. Most quotes are sent back within 48 hours, guaranteed.